COMPLETE INSTALLATION MANUAL FOR DOOSAN DBC130II | (PDF DOWNLOAD)
1. Discover the essential DOOSAN DBC130II Installation Manual, now available in a convenient PDF format. This comprehensive guide is designed to streamline the installation process, ensuring that you have all the necessary information at your fingertips.
2. With clear instructions and detailed illustrations, the manual simplifies complex procedures, making it easy for both professionals and DIY enthusiasts to achieve optimal results. Save time and reduce the risk of errors with this user-friendly resource that covers everything from setup to troubleshooting.
3. Invest in your efficiency and confidence with the DOOSAN DBC130II Installation Manual. Download your PDF today and take the first step towards a successful installation experience.
MODEL COVERED :
DOOSAN DBC130II
CONTENT INCLUDED:
Installation Site 6
Foundation work 11
Foundation work timing and post checkpoints 11
Foundation work for installing the machine 11
Transportation 17
What’s included 18
Table Bed Ass’y 18
Column Bed Ass’y 20
Column Body Ass’y 22
Spindle Head Ass’y 23
Duct Ass’y 24
Coolant Tank, Chip Bucket, Chip Conveyor, TSC Ass’y, T/F(Option) 25
Tool Magazine Ass’y (Option) 26
Semi Splash Guard – Operator Part (Option) 27
Semi Splash Guard – Magazine Part (Option) 29
Semi Splash Guard – Table Part (Option) 30
List of tools related to the foundation work (1) 32
List of tools related to the foundation work (2) 33
BOLT KIT Shipping LIST 35
Installing the machine temporarily 38
Temporary installation of the column bed (Z-axis bed) assembly 38
Temporary installation of the table bed (X-axis bed) assembly 41
Temporary Installation of ATC Base 44
Second Round of Grout Injection 46
Checkpoints before injecting grout 46
Selection of Grout 46
Blending the grout mixture 47
Injecting the grout mixture 48
Curing the surface of grout 49
Assembling the main unit 50
Installing the column 50
Installing the spindle head 52
Installing the hydraulic power unit, electric cabinet, OP box and ducts 55
Wiring 57
Connecting the hydraulic and air hoses 61
Connecting the tool magazine wires and hydraulic hoses 62
Removing the transit clamps 63
Checking and fueling the oil tanks 64
Hydraulic tank 64
Oil Cooler Tank 64
Table 64
Lub Tank 64
Spindle Air Oil Tank 65
Air Service Unit Oiler Tank 65
Spindle Head Air Filter Unit Oiler Tank 65
Connecting the main power and air sources 66
Connect the main power source 66
Connecting the main air source 66
Power On 68
Checking the pressure on each unit 69
Assembling and adjusting the Y axis 71
Installing the ball screw nut in the Y axis 71
Installing the Y-axis taper gib and back plate gib 71
TOTAL PAGES - 122
FILE FORMAT: PDF
LANGUAGE: ENGLISH
EXCEPTIONAL SUPPORT 24X7, SECURE, EASY ORDERING
COMPATIBLE: ALL VERSIONS OF WINDOWS, ANDROID & MAC
DOWNLOAD: YOU WILL RECEIVE LINK ON YOUR EMAIL AFTER PURCHASE.